www.trusteddocks.com

Compare Shipyards

Knots
MT per day
USD per MT
USD per day
Shipyard name MUKAISHIMA DOCKYARD Tsuneishi Factory
Location
Hiroshima, Japan
Fukuyama, Japan
Dimensions Max. Length: 162.0m / 531.5ft  | Max. Width: 30.0m / 98.4ft  | Max. Draft: 11.0m / 36.1ft Max. Length: 330.0m / 1,082.7ft  | Max. Width: 53.0m / 173.9ft  | Max. Draft: 7.5m / 24.6ft
MUKAISHIMA DOCKYARD
Tsuneishi Factory
Services
  • New Buildings
  • Repairs
    • Ship Repairs
  • New Buildings
  • Repairs
Certificates
Description

Mukaishima Dockyard is a shipbuilding and repair company located in Hiroshima, Japan. <br /><br />It was founded in 1902 and has been in operation for over a century. <br /><br />The company specializes in building and repairing various types of vessels, including cargo ships, tankers, and fishing boats. <br /><br />Mukaishima Dockyard has a dry dock that can accommodate ships up to 200 meters in length and 30 meters in width. <br /><br />The company has a workforce of over 300 employees and is known for its high-quality workmanship and attention to detail. <br /><br />In addition to shipbuilding and repair, Mukaishima Dockyard also provides marine engineering services, such as design and construction of marine structures and offshore facilities. <br /><br />The company has a strong commitment to environmental sustainability and has implemented various measures to reduce its carbon footprint and minimize waste. <br /><br />Mukaishima Dockyard has a long history of contributing to the local economy and community in Hiroshima, and is considered a valuable asset to the region. <br /><br />Overall, Mukaishima Dockyard is a respected and reputable shipbuilding and repair company with a rich history and a strong commitment to quality and sustainability.more

Located in Tsuneishi, Numakuma-cho, Fukuyama-shi, a city facing the Seto Inland Sea in the eastern part of Hiroshima Prefecture. The new ship building division is equipped with one dock and one berth for shipbuilding, and its annual construction capacity is about 12 ships in terms of 82,000-ton-class bulk carriers. The adjacent repair factory, having 4 docks exclusively for repair and 7 repair wharves, can dock vessels of up to 20,000-DWT. Undertaking not only periodical inspection and ordinary repair work but also large-scale modification and ballast water management system retrofit work, we support the safe operation of ships.more

Facilities
Type Name Length [m/ft] Width [m/ft] Draft [m/ft] Lifting capacity [t] Max crane SWL [t] Num. Cranes
Graving dock Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now.
Graving dock Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now.
Graving dock Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now.
Floating dock Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now.
Type Name Length [m/ft] Width [m/ft] Draft [m/ft] Lifting capacity [t] Max crane SWL [t] Num. Cranes
Graving dock No.1 Dock Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now.
Graving dock No.10 Dock Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now.
Graving dock No.10 Dock Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now.
Graving dock No.11 Dock Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now.
Repairing berth R5 Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now.
Repairing berth R6 Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now.
Repairing berth R7 Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now.
Repairing berth R10 Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now.
Repairing berth R11 Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now.
Repairing berth R12 Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now.
Outfitting pier R8 Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now.
Deviation cost
Advertisement: